Quantcast
Channel: Tribune Democrat: Announcements
Viewing all articles
Browse latest Browse all 35925

(PUBLISHED IN THE STILLWATER ...

$
0
0
(Published in the Stillwater News Press July 24, 2015 1t) DEQ NOTICE OF TIER II DRAFT PERMIT A Tier II application for an air quality Major Source (Title V) Operating Permit renewal has been filed with Oklahoma Department of Environmental Quality (DEQ) by the applicant, The Shutter Mill (dba Kirtz Shutters), located at 8517 South Perkins Road, Stillwater, OK 74074. The applicant requests approval to continue operation of a Wooden Shutter Manufacturing Plant at 8517 South Perkins Road, Stillwater, OK 74074. The legal property description is Section 24, Township 18N, Range 2E in Payne County. In response to the application, DEQ has prepared a draft permit, permit number 2015-0804-TVR2, which may be reviewed at the Public Library, 1107 South Duck, Stillwater, OK: 74074 or at the Air Quality Division's main office (see address below). The draft permit is also available for review in the Air Quality Section of DEQ's Web Page: http://www.deq.state.ok.us/. This draft permit would authorize the facility to emit the following regulated pollutants, measured in tons/year: total VOC 43.79; butyl c;:ellosolve 0.50; ethyl benzene 0.0!; ethylene glycol 0.05; methyl isobutyl ketone 0.6; methanol 1.1; naphthalene 0.01; phthalocyanine green 0.01; toluene 8; xylene 0.05; particulate matter 30.7; NOx 2.25; CO 13.25. The public comment period ends 30 days after the date of publication of this notice. Any person may submit written comments concerning the draft permit to the Air Quality Division contact listed below. A public meeting on the draft permit may also be r·equested in writing at the same address. Note that all public meetings are to be arranged and conducted by DEQ/CSD staff. In addition to the public comment opportunity offered under this notice, this draft permit is subject to U.S. Environmental Protection Agency (EPA) review, EPA objection, and petition to EPA, as provided by 40 CFR § 70.8. If the Administrator (EPA) does not object to the proposed permit, the public has 60 days following he Administrator's 45 day review period to petition the Administrator to make such an objection as provided in 40 CFR 70.8(d) and in OAC 252:100-8-8(j). Information on all permit actions and applicable review time lines in available in the Air Quality section of DEQ Web page: http://www.deq.state.ok.us/. For additional information, contact Mr. Chris Tietz, The Shutter Mill, at 8517 South Perkins Road, Stillwater, OK 74074, Phone (405) 377-6455, or contact DEQ at: Chief Engineer, Permits&Engineering Group, Air Quality Division, 707 N. Robinson, Suite 4100, P.O. Box 1677, Oklahoma City, OK, 73101-1677, Phone: (405) 702-4100.

Viewing all articles
Browse latest Browse all 35925

Trending Articles